BIOABSORCIÓN DE Pb (II) Y Cr (III) USANDO LA PLANTA ACUÁTICA Pistia stratioides / BIOABSORPTION OF Pb (II) AND Cr (III) USING THE AQUATIC PLANT Pistia stratioides

Autores/as

  • MARELIS MEZA PÉREZ Escuela de Ingeniería Civil, Facultad de Ingeniería, La Universidad del Zulia, Apartado postal 526, Maracaibo 4001-A, Estado Zulia
  • JULIO CÉSAR MARÍN Escuela de Ingeniería Civil, Facultad de Ingeniería, La Universidad del Zulia, Apartado postal 526, Maracaibo 4001-A, Estado Zulia
  • ELISABETH BEHLING QUINTERO Escuela de Ingeniería Civil, Facultad de Ingeniería, La Universidad del Zulia, Apartado postal 526, Maracaibo 4001-A, Estado Zulia
  • GILBERTO COLINA ANDRADE Escuela de Ingeniería Civil, Facultad de Ingeniería, La Universidad del Zulia, Apartado postal 526, Maracaibo 4001-A, Estado Zulia
  • NANCY RINCÓN LIZARDO Escuela de Ingeniería Civil, Facultad de Ingeniería, La Universidad del Zulia, Apartado postal 526, Maracaibo 4001-A, Estado Zulia
  • CRISTIAN ARTURO POLO Escuela de Ingeniería Civil, Facultad de Ingeniería, La Universidad del Zulia, Apartado postal 526, Maracaibo 4001-A, Estado Zulia

Palabras clave:

Bioabsorción, Efluentes industriales, Fitorremediación, Metales pesados, Pistia stratioides.

Resumen

Los efluentes industriales, particularmente en la explotación minera y petrolera, contienen una diversidad de sustancias quepueden ocasionar un impacto al ambiente, entre estos contaminantes se encuentran los metales. En el presente estudio seevaluó la capacidad de la planta acuática P. stratioides para bioabsorber Pb (II) y Cr (III), a escala de laboratorio. Para ello,se diseñaron microcosmos a flujo semi-continuo, conformados por cubetas de vidrio (20 L de volumen total) y efluentesintético contaminado con Pb (II) (1 y 5 mg/L), Cr (III) (4 y 6 mg/L) y una mezcla de Pb (II) (5 mg/L) y Cr (III) (4 mg/L).Se tomaron muestras del efluente tratado cada 24 h para analizar pH, oxígeno disuelto, alcalinidad total, temperatura y laconcentración de los metales. Los resultados muestran una disminución de las concentraciones de los metales en relacióncon el tiempo, la remoción total fue de 76,8 y 81,3% para Pb (II); 81,1 y 69,9% para Cr (III) en los ensayos individuales,respectivamente, y de 73,4% Pb (II) y 77,9% Cr (III) para la mezcla. La mayor absorción de los metales se obtuvo en losprimeros días de ensayo, acumulándose principalmente en las raíces de la planta. Se concluyó que P. stratioides es unaalternativa viable en sistemas biológicos tipo humedales, para el tratamiento de efluentes contaminados con metales.


ABSTRACT

The industrial effluents, particularly in mining and oil industries, contain a variety of substances that can cause an impactto the environment. Metals are among these contaminants. In this work the ability of the aquatic plant P. stratioides forbioabsorber Pb (II) and Cr (III), at laboratory scale, was evaluated. To this end, microcosms at semi-continuous flowformed at glass basins (20 L of total volume) and synthetic effluent contaminated with Pb (II) (1 and 5 mg/L) Cr (III) (4 and6 mg/L) and a mixture of Pb (II) (5 mg/L) and Cr (III) (4 mg/L), were prepared. Effluent samples were taken every 24 h toassess pH, dissolved oxygen, total alkalinity, temperature and concentration of metals. The results show a decrease in theconcentrations of the metals as a function of time. The total removal was 76.8 and 81.3% for Pb (II); 81.1 and 69.9% forCr (III) for the individual tests respectively, and 73.4% Pb (II) and 77.9% Cr (III) for the mixture. The greatest absorptionof metals was obtained in the early days of test, mainly accumulated in the plant roots. P. stratioides is a viable alternativefor treatment of metal-contaminated effluents, using wetland systems.

Keywords: Bioabsorption, Industrial effluents, Phytoremediation, Heavy metals, Pistia stratioides.

Descargas

Los datos de descargas todavía no están disponibles.

Biografía del autor/a

MARELIS MEZA PÉREZ, Escuela de Ingeniería Civil, Facultad de Ingeniería, La Universidad del Zulia, Apartado postal 526, Maracaibo 4001-A, Estado Zulia

Departamento de Ingeniería Sanitaria y Ambiental (DISA)

JULIO CÉSAR MARÍN, Escuela de Ingeniería Civil, Facultad de Ingeniería, La Universidad del Zulia, Apartado postal 526, Maracaibo 4001-A, Estado Zulia

Departamento de Ingeniería Sanitaria y Ambiental (DISA)

ELISABETH BEHLING QUINTERO, Escuela de Ingeniería Civil, Facultad de Ingeniería, La Universidad del Zulia, Apartado postal 526, Maracaibo 4001-A, Estado Zulia

Departamento de Ingeniería Sanitaria y Ambiental (DISA)

GILBERTO COLINA ANDRADE, Escuela de Ingeniería Civil, Facultad de Ingeniería, La Universidad del Zulia, Apartado postal 526, Maracaibo 4001-A, Estado Zulia

Departamento de Ingeniería Sanitaria y Ambiental (DISA)

NANCY RINCÓN LIZARDO, Escuela de Ingeniería Civil, Facultad de Ingeniería, La Universidad del Zulia, Apartado postal 526, Maracaibo 4001-A, Estado Zulia

Departamento de Ingeniería Sanitaria y Ambiental (DISA)

CRISTIAN ARTURO POLO, Escuela de Ingeniería Civil, Facultad de Ingeniería, La Universidad del Zulia, Apartado postal 526, Maracaibo 4001-A, Estado Zulia

Departamento de Ingeniería Sanitaria y Ambiental (DISA)

Descargas